Market

City Stops Construction at Sites Tied to Brooklyn Collapse

New York City is putting construction projects linked to two engineers involved in a fatal Brooklyn building collapse under the microscope, halting work at multiple sites as officials widen their safety crackdown.

The Department of Buildings issued full or partial stop-work orders to at least five projects connected to engineers who worked on the Flatbush excavation site where a neighboring apartment building collapsed Nov. 11, killing eight, Gothamist reported. The agency has inspected at least 24 job sites across four boroughs tied to the two engineers, Jieming Wang and MD Ariful Islam.

The sweeps are part of a broader inspection blitz targeting roughly 160 projects involving six firms connected to the Flatbush job. Wang, through his New Jersey-based LMW Engineering Group, submitted structural drawings and excavation support plans for the site. His city-approved plans did not call for steel bracing or underpinning to support neighboring buildings during excavation.

Islam, whose Queens-based RI Consulting Services worked on the project, was hired to monitor excavation and shoring as a special inspector. He applied to withdraw from the job one day after the collapse, though the DOB has not approved his request.

Among the projects hit with stop-work orders is a luxury condo conversion at 332 West 11th Street in Greenwich Village, where inspectors halted exterior work after finding unsafe scaffolding. The site previously drew scrutiny during an inspection sweep following a near-collapse of the Pfizer office-to-residential conversion.

In Woodside, Queens, inspectors halted interior work at a six-story apartment building after finding a worker on scaffolding without a safety harness. A Bronx apartment project at 1021 Summit Avenue also saw exterior work stopped over scaffolding violations.

Another Bronx development at 58 West 184th Street, where Islam designed excavation safety plans, received a full stop-work order after a contractor allegedly refused an inspector entry and threatened to lock the inspector inside the site.

The violations so far have largely involved scaffolding, guardrails and other jobsite safety issues rather than excavation failures. Only one of the orders involved excavation, the central concern in the Flatbush collapse investigation.

The DOB declined to disclose further details about the sweeps.

Monday also brought the first legal complaint related to the collapse, when a tenant of the fallen apartment building sued his landlord and several construction firms, alleging his warnings about cracks near the entrance of the property went ignored, Gothamist reported.

The demolition contractor at the construction site next door, N Tech Design of America, is facing scrutiny over a history of numerous DOB violations, including ignoring a stop-work order prior to the disaster.

— Holden Walter-Warner

Read more

Contractor on Site Next to Flatbush Collapse Stacked Fines

Contractor stacked demo-related fines at 24 sites pre-collapse


First responders tend to a collapsed building in Brooklyn

City plans 100-building inspection sweep after deadly building collapse


City Council member Farah Louis and Mayor Zohran Mamdani

Policy Pro: Brooklyn building collapse sparks construction moratorium push





Source link

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *